by Maikel Pineda | June 12, 2024 7:31 AM
The team did such a good job enclosing the sides with plastic sheets. This project will eventually enable the church to install air conditioning in the main building.
![Construction Project Day 2](https://trip-journals.storage.googleapis.com/19665/128934.jpg)
Subscribe To Updates
Comments
No comments have been posted.